Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF:
Design and install containment and work perimeter scaffold spanning from one building to adjacent building, to assemble and install cladding and glazing to “Link Bridge” structure 10 storeys above ground.
FEATURES:
- Full containment around steel structure of link bridge.
- Crane installation of spanning scaffold trusses from 4 Parramatta Square to 6-8 Parramatta Square
- Allowance in the overall scaffold structure for relative movement in the building structures by ~100mm – rolling bearings incorporated.
- Progressive dismantle as ‘Link Bridge’ was clad & glazed.
Share
Categories
Related items
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
Shape Star Casino
BRIEF: Design & Install Scaffolding and Swinging Stages for recladding FEATURES: 50t Birdcage within Lobby…
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…