Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF:
Design and install containment and work perimeter scaffold spanning from one building to adjacent building, to assemble and install cladding and glazing to “Link Bridge” structure 10 storeys above ground.
FEATURES:
- Full containment around steel structure of link bridge.
- Crane installation of spanning scaffold trusses from 4 Parramatta Square to 6-8 Parramatta Square
- Allowance in the overall scaffold structure for relative movement in the building structures by ~100mm – rolling bearings incorporated.
- Progressive dismantle as ‘Link Bridge’ was clad & glazed.
Share
Categories
Related items
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…