Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF:
Suspended Scaffolding and overhead protection.
FEATURES:
- Suspended and encapsulated catch deck over water – 40m x 4m
- 10kPa overhead protection over roadways