Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF:
Suspended Scaffolding and overhead protection.
FEATURES:
- Suspended and encapsulated catch deck over water – 40m x 4m
- 10kPa overhead protection over roadways
Share
Categories
Related items
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…