Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF:
Design and install catch / work platforms below the up and down rail lines, and in the cess. Access for re-transforming and re-railing works during rail shutdowns.
FEATURES:
- Integrated scaffold platforms bearing to existing bridge steel members. Fall protection for workers on rail.
- Platforms installed and relocated from existing bridge maintenance gantry, coverage of entire bridge spans achievable for maximizing work productivity during limited time frame rail shutdowns.
- Installation of platforms could be undertaken during normal hours, in preparation for rail shutdowns. Management of waterways below achieved during day works.
Share
Categories
Related items
VILLAGE QUAY, RHODES
Brief Design and install a monorail and swinging stage installation to provide rapid access over…
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…