Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF:
Design and install catch / work platforms below the up and down rail lines, and in the cess. Access for re-transforming and re-railing works during rail shutdowns.
FEATURES:
- Integrated scaffold platforms bearing to existing bridge steel members. Fall protection for workers on rail.
- Platforms installed and relocated from existing bridge maintenance gantry, coverage of entire bridge spans achievable for maximizing work productivity during limited time frame rail shutdowns.
- Installation of platforms could be undertaken during normal hours, in preparation for rail shutdowns. Management of waterways below achieved during day works.
Share
Categories
Related items
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
NORTHCONNEX – DARLING MILLS BRIDGE WIDENING
Brief Design & install various stretcher stair installations to provide safe access to the abutments…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…