Shape ABC
BRIEF:
Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding & Swinging stages covered the external façade.
An MBA was awarded to SHAPE for this project, focusing on SCAFFOLDING and their commitment to site safety.
FEATURES:
- Internal Atrium Overhead protection – 135m in length x 16m High
- External sawtooth shaped façade scaffold projecting up 24m in height and spanning the full length of the feature façade (~100m) Inclusive of shrink-wrapped roof for complete containment during replacement of cladding
- 14 x Swinging Stages in use and running at the same time
Share
Categories
Related items
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…