Shape ABC
BRIEF:
Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding & Swinging stages covered the external façade.
An MBA was awarded to SHAPE for this project, focusing on SCAFFOLDING and their commitment to site safety.
FEATURES:
- Internal Atrium Overhead protection – 135m in length x 16m High
- External sawtooth shaped façade scaffold projecting up 24m in height and spanning the full length of the feature façade (~100m) Inclusive of shrink-wrapped roof for complete containment during replacement of cladding
- 14 x Swinging Stages in use and running at the same time
Share
Categories
Related items
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
NATIONAL CIRCUIT
Brief Design and install a large area work & containment bridging platform over the atrium…
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…