Shape ABC
BRIEF:
Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding & Swinging stages covered the external façade.
An MBA was awarded to SHAPE for this project, focusing on SCAFFOLDING and their commitment to site safety.
FEATURES:
- Internal Atrium Overhead protection – 135m in length x 16m High
- External sawtooth shaped façade scaffold projecting up 24m in height and spanning the full length of the feature façade (~100m) Inclusive of shrink-wrapped roof for complete containment during replacement of cladding
- 14 x Swinging Stages in use and running at the same time
Share
Categories
Related items
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…