Shape Star Casino
BRIEF:
Design & Install Scaffolding and Swinging Stages for recladding
FEATURES:
- 50t Birdcage within Lobby installed, relocated and removed within a 3month time frame
- 2 x Swinging Stages and over head protection for external stair core walls
- The building remained open at all times
Share
Categories
Related items
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…