Transport for NSW – Sydney Harbour Bridge
BRIEF:
Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the road deck for blasting and painting works.
FEATURES:
- 3 x Suspended Scaffolds being relocated along bridge over 18 locations – Each 6m wide, 50m Long with 2 working levels
- Suspended from bridge girders using chains
- Configured to allow free travel of main span gantries below
Share
Categories
Related items
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…