Transport for NSW – Sydney Harbour Bridge
BRIEF:
Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the road deck for blasting and painting works.
FEATURES:
- 3 x Suspended Scaffolds being relocated along bridge over 18 locations – Each 6m wide, 50m Long with 2 working levels
- Suspended from bridge girders using chains
- Configured to allow free travel of main span gantries below
Share
Categories
Related items
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…