BRIEF:
Above were asked by their client to provide an efficient solution to replace cladding on the 2 upper levels of the building. Individual cladding pieces were 3.8m in height each – Scaffolding was the solution.
A winch driven suspended scaffold was designed and installed with a 450kg WLL. This approach removed the need to scaffold from the base of the building to the top which would have added more time into the program and façade penetration for scaffold ties at each finished floor.
FEATURES:
- Scaffold was erected on ground floor then driven up into position in 3 sections
Share
Categories
Related items
Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF: Design and install catch / work platforms below the up and down rail lines,…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
BARANGAROO TOWER 1
Brief Design and install a falsework solution to allow pouring of crane penetration infills at…