LAWRENCE HARGRAVE DRIVE
Brief
Design and install an access and containment scaffold suspended from the LHD footpath to provide access along the outside and underneath the footpath for its full extent tofacilitate concrete repair and painting. The design and installation methodology to enable the scaffold to be installed without working from the embankment. All debris and paint to be fully contained.
Features
- 100m long suspended access and containment scaffold.
- Stair access up and over the edge railing at both ends.
- Medium Duty Rating.
- Pre-assembled modules delivered and lifted into position using a crane truck.
- Special kerb brackets to secure and suspend the scaffold installed from the footpath.
Share
Project Name
Lawrence Hargrave Drive
Principal
RMS
Installation
Suspended Access and Containment Scaffold Under Suspended Foothpath
Related items
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…