CENTRAL PARK – SKYDECK
Brief
Design and install a large area work platform installation to be suspended from the cantilevered Heliostat structure, some 100m above ground, to facilitate installation of sofit superstructure and cladding. Installation and dismantle methodologies to minimise risks associated with working at height.
Scaffold installation to be designed for 1 in 100 year wind event.
Features
- Skydeck Area – 15m x 5m
- Skydeck assembled at ground level and then raised up to position using scaffold hoists.
- Skydeck secured in working position with suspension chains.
- Access onto skydek from skygarden above.
Project Name
Central Park - Skydeck
Principal
WATPAC
Installation
Suspended Traveling 'SKYDECK'
Related items
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…