CENTRAL PARK
Brief
Design and install modular special duty swinging stages to facilitate installation and planting of the feature green wall installations. Stages to be configured to minimise risk of contact with wire trellis
Features
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Powered wire rope reelers to gather and manage trailing ropes
- Access into stage from roof level
- Load Lmiters to manage risk of fouling with façade elements
Share
Project Name
Central Park
Principal
WATPAC
Installation
Swinging Stages For Green Wall Installation
Categories
Related items
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief Design and install a suspended scaffold installation to the underside of the Sydney Harbour…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…