Transport for NSW – Sydney Harbour Bridge
BRIEF:
Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the road deck for blasting and painting works.
FEATURES:
- 3 x Suspended Scaffolds being relocated along bridge over 18 locations – Each 6m wide, 50m Long with 2 working levels
- Suspended from bridge girders using chains
- Configured to allow free travel of main span gantries below