Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF:
Suspended Scaffolding and overhead protection.
FEATURES:
- Suspended and encapsulated catch deck over water – 40m x 4m
- 10kPa overhead protection over roadways
Categories
Related items
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
VILLAGE QUAY, RHODES
Brief Design and install a monorail and swinging stage installation to provide rapid access over…