BARANGAROO TOWER 1

Brief
Design and install a falsework solution to allow pouring of crane penetration infills at 3 levels, simultaneously. All penetrations directly above each other. Falsework needed to span over the penetration below, while allowing formwork installation to pour the slab above.

Features

  • Falsework structures were built away from edge of penetration and rolled into position
  • Access was maintained to pour the L03, L02 and L01 infills without obstruction due to falsework spanning over the voids
  • U head jacks and internal ladder access allowed traditional formwork to be insalled quickly and safely
Project Name
BARANGAROO TOWER 1
Principal
Lend Lease
Installation
FalseworkK Scaffolds