1300 30 15 20 PO Box 195 LINDFIELD NSW 2070

Portfolio

CENTRAL PARK

Brief
Design and install modular special duty swinging stages to facilitate installation and planting of the feature green wall installations. Stages to be configured to minimise risk of contact with wire trellis

Features

  • Working Load Limit 3 persons + 200kg materials
  • Stage lengths variable up to 12m
  • Powered wire rope reelers to gather and manage trailing ropes
  • Access into stage from roof level
  • Load Lmiters to manage risk of fouling with façade elements
Project Name
Central Park
Principal
WATPAC
Installation
Swinging Stages For Green Wall Installation
© 2021 Above Scaffolding. Privacy Policy