NATIONAL CIRCUIT
Brief
Design and install a large area work & containment bridging platform over the atrium void, to provide access for glass roof installation. Design and install a travelling large area work and containment platform, suspended from the bridging scaffold, to travel from level to level, to facilitate installation of slab edge cladding and balustrades while enabling groundworks to proceed simultaneously.
Features
- Bridging Platform Area – 9m x 20m
- Travelling Platform Area -7.5m x 18m
- Vertical Travel – 30m
- Traveling Platform powered by two pairs of 240V, 20A electric scaffold hoists
- Independent overspeed safety brakes operate in tandem with hoists.
Share
Project Name
National Circuit
Principal
Lend Lease
Installation
Over-Void 'SKYDECK' Platform With Travelling Void IN-FILL Platform
Related items
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…