NATIONAL CIRCUIT

Brief
Design and install a large area work & containment bridging platform over the atrium void, to provide access for glass roof installation. Design and install a travelling large area work and containment platform, suspended from the bridging scaffold, to travel from level to level, to facilitate installation of slab edge cladding and balustrades while enabling groundworks to proceed simultaneously.

Features

  • Bridging Platform Area – 9m x 20m
  • Travelling Platform Area -7.5m x 18m
  • Vertical Travel – 30m
  • Traveling Platform powered by two pairs of 240V, 20A electric scaffold hoists
  • Independent overspeed safety brakes operate in tandem with hoists.
Project Name
National Circuit
Principal
Lend Lease
Installation
Over-Void 'SKYDECK' Platform With Travelling Void IN-FILL Platform