Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief
Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the main span cross girders. The design and methodology to ensure no obstruction to the travel of the main span gantry, and to allow the scaffolds to be readily relocated from cross girder to cross girder.
Features
- Each scaffold is 50m long x 7m wide x 3m high
- 84 suspension chain assemblies per scaffold
- Access onto scaffolds from bridge catwalks
Share
Project Name
Sydney Harbour Bridge - Main Span Cross Girder Painting
Principal
RMS
Installation
Suspended Underdeck Access and Containment Scaffolds
Related items
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…