VILLAGE QUAY, RHODES
Brief
Design and install a monorail and swinging stage installation to provide rapid access over the full extent of the residential tower façade for installation of architectural window framing. System to permit the stage to operate above the projecting balconies and avoid wire ropes contacting the finished facade.
Features
- 9m long swinging stage travelling on 40m long monorail.
- Powered wire rope reelers to gather and manage the wire ropes
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Load Lmiters to manage risk of fouling with façade elements and overloading the monorail.
Share
Project Name
Village Quay, Rhodes
Principal
Billbergia
Installation
Traveling Swinging Stage On Monorail
Categories
Related items
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…