Brief
Design and install a monorail and swinging stage installation to provide rapid access over the full extent of the residential tower façade for installation of architectural window framing. System to permit the stage to operate above the projecting balconies and avoid wire ropes contacting the finished facade.
Features
- 9m long swinging stage travelling on 40m long monorail.
- Powered wire rope reelers to gather and manage the wire ropes
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Load Lmiters to manage risk of fouling with façade elements and overloading the monorail.
Project Name
Village Quay, Rhodes
Principal
Billbergia
Installation
Traveling Swinging Stage On Monorail
Categories
Related items
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…