1300 30 15 20 PO Box 195 LINDFIELD NSW 2070

Travelling Platforms

he superior capacities of the Layher system components and connections in combination with high strength lattice beams and our fleet of powered hoists and associated safety equipment enable us to design and construct large area travelling work platforms.

For soffit and underbridge works, pre-assembling the work platform at ground level then driving the work platform up into position eliminates risk, saves time and reduces costs.

For multi-level atrium works, using a travelling work platform to provide safe access to each level eliminates the need for very large birdcage scaffolds built from the ground up.

Let's start a conversation about your next major project. Email us mail@abovescaffolding.com.au or call 1300 30 15 20

PROVIDING QUALITY SERVICES TO INDUSTRY LEADERS

Testimonials

Above Scaffolding took care of our scaffolding needs so we could carry out works to a roof frame above the swimming pools at Aquafit, Campbelltown. The roof frame required propping, which Owen - Above's Engineer - designed to be integral with the scaffold. Whilst erecting and dismantling the scaffold, the crew were under watchful eyes of gym members and staff. They should be commended for their professionalism and cooperative approach. I wouldn't hesitate to recommend Above Scaffolding for future projects.

Moath Ismail

Richard King - Project Manager for Lipman Pty Ltd
Scored a 91% on Mirvac's HSE Implementation Review - A review thats held at the end of the project to assess a subcontractor's adherence to safety throughout the project. 91% is considered "Outstanding" - the highest bracket available.

Moath Ismail

HSE Implementation Review from Mirvac at ATP Building 2 site in Eveleigh
First of all, I’d like to once again thank you for your effort with this project. I’ve had a lot of good feedback regarding the design, quality and workmanship of the scaffold. Furthermore, your guys on site did a great job on the weekend and they certainly made the job run very smoothly and safely.

SYDNEY TRAINS PROJECT ENGINEER

FOR THE SALT PAN CREEK BRIDGE SUSPENDED SCAFFOLD
© 2021 Above Scaffolding. Privacy Policy